Intent to purchase 09 plastic Fair soared 528 000 000

Staff size enterprises Purchasing products The total amount of procurement 500 Chi Mei ABS , PA757, PA765A; LG ABS121H, FR500; B AS F ABSGP22, GP35; Sabbc PC + ABS C6200; Teijin PC1225L / Y About 1 million / year 1,000 F220GG, EV101, M300054, DF840 1,000 EPDM rubber, natural rubber, DOP, DPHP, PVC Resins, rubber additives, linear low density polyethylene, low density polyethylene 100 000 000 8 1 000 4 million 500 PP, PS, PE and Injection molding machine , Die About 52 million More than 100 people A three-tier co-extrusion PE shrink film production line and auxiliary equipment, film thickness 20 m-150 m, speed 120 m / min maximum vesicle break through 30 meters of annual output of 2,000 tons of imported technology made the best production line 12 million yuan 260 Instrumentation ( Plastic bottles ), Plastic processing equipment, 200-250 million More than 100 people PPO , ABS, ABS + PC, PC particles About 20 million More than 100 people PA66 Resin material, PA66 resin material, PC resin material, vibration screw feeder About 2.2 million 700 Plans to purchase the number of products planned purchase amount is expected to purchase the product

PP modified material (Orange) 180 tons 2.34 million yuan

PP modified material (black) 140 tons 1.68 million

Purchase product requirements: PP modified material (orange): PP copolymer modified, must be material, have anti-UV requirements.

Requirements for suppliers: the best in North China 4020000 About 150 Plans to purchase the product plans to purchase the number of estimated purchase amount of the product

Film blowing machine 10 sets 600 000

Color printing units 240 000 8

Making machine 20 sets of 1 million Degradation of plastic raw materials

Purchase product requirements: equipment, technical performance, energy-saving

Supplier requirements: Guangzhou, Zhejiang and Jiangsu province, informal enterprises About 1.8 million 300

Plans to purchase the number of products planned purchase amount is expected to purchase the product

Drawing class polypropylene (PP) granules> 50> 500,000 yuan

Polyethylene (PE) pellets> 20 t> 200 thousand yuan

Bag (t) bag lock / code boundary line (PP / PE)   > 10 t> 200 thousand yuan

Plastic (PP / PE) wire drawing machine 1 sets production line> 1 million yuan

Plastic (PP / PE) made material unit 1 sets production line> 300 thousand yuan

PSA> 10 t> 200 thousand yuan

Purchase the product requirements: high quality real value to meet production requirements

Supplier requirements: sincere and efficient service and responsible. Qualified, long-term sustained strength of supporting services.

Additional Notes: The best in North China 2400000 More than 100 people Complex machine, three times, sealing bag making machine 500 000 -60 10 000 160 PP, PS material 1950000 More than 100 people PET recycling material, antioxidant, plasticizer, presses auxiliary, plastic machinery 17,800,000 200 80 Blow Molding Machine Hai Jinwei 300 000 injection molding machine at about HXF568 800 000 3000 Plans to purchase the number of products planned purchase amount is expected to purchase the product

Pp 60 tons / month ABS 50 tons / month PC 100 tons / month PA66 20 tons / month PVC 400 tons / month DOP 200 ton / month Purchase product requirements: compliance with company requirements

Supplier requirements: timely delivery, good service, strong financial More than 250 Plans to purchase the number of products planned purchase amount is expected to purchase the product

Surface treatment machines (multi) 1 1000000

Hot melt coating machine 1 800 000

Purchase product requirements: 1: hot melt coating machine: PVC coated hot melt adhesive

Supplier requirements: 1800000 3,000 Plans to purchase the number of products planned purchase amount is expected to purchase the product

ABS 15000 tons / year 200 000 000

Injection Parts 300 (million) 60 million

Protective film 8 million square 10,000,000

Purchase product requirements: According to him, seems to be an original manufacturer is ABS (Korea LG), asked him to not plant, parts can be a dealer! ROHS environmental protection requirements

Supplier requirements: a self-mold and development capabilities, financial strength 200 000 000 1,200 Plans to purchase the number of products planned purchase amount is expected to purchase the product

PVC pipe extrusion line 2 560 000

Plastic milling machine 2 80 000

Plastic pieces broken machine 1 200 000

Plastic injection mold pipe 50 sets 500 000

Purchase product requirements: cost-effective, quality, leading

Supplier requirements: have a certain reputation, business focus on technology innovation 1.34 million More than 800 people

Plans to purchase the number of products planned purchase amount is expected to purchase the product

Ldpe and lldpe 500 650 6.5 million 1,000 Plans to purchase the number of products planned purchase amount is expected to purchase the product

DOP (DOP) on volume of 25 tons

DBP (dibutyl) on volume of 80 tons

PVC (polyvinyl chloride resin 3) on volume of 100 tons

PPVC (PVC paste resin 450) on volume of 300 tons

Purchase product requirements: compliance with national standard-level products

Supplier requirements: delivery to the Company, cash on delivery About 450 800T injection molding machine (with low pressure injection function), 1300T injection molding machines 300 PE a back feed, wood flour, EVA powder, HDPE powder, PE regrind 1,000 PP HT9020M Maoming, PP K4912 Yan, PP S800-1 Luoyang, PP J600 Luoyang, Qilu PE 6098, PE 9455F Jilin 300 A total of PP in, plastic masterbatch, LLDPE 300 PVC-5 #, 7 #, composite stabilizer, CPE

I am China Manufacturers writer, reports some information about bamboo plank flooring , floating bamboo floors.

Processing your request, Please wait....

Leave a Reply