Shandong introduced two changes in heating prices in recent Liucheng mystery

October 21 is the year Heating Period, conditional construction in Shandong Province will pilot two heat prices charged; to 2010, install temperature and heat metering devices, all on a trial basis two heat prices charged. Shandong Province promulgated the "speed up the province's cities Heating Energy Work notice "to disclose this information.

Year running heating simulation of thermal measurement

Decision in Shandong Province, in 2009 heating season, all temperature and heat metering devices installed on the new and old buildings have all metering simulation run, data acquisition; conditional on a trial basis two heat prices charged; to install 2010 Temperature and heat measuring devices, all on a trial basis two heat prices charged. What is the "two systems" hot price charged? In 2007, the National Development and Reform Commission and the former Ministry of Construction promulgated the "Interim Measures on Management of Heating price" requirement, heat Sell Prices should gradually implement the basic measurement of heat value and heat value of combining two heat prices. Reflects the fixed costs of basic heat price; measured heat price reflects the variable cost. Basic heat price can follow 30% of the total heat value of the standard-setting -60%.

Heating pipe network transformation to deliver that year started the year

Learned, Shandong Province will give priority to the condensing heat Motor Group Boiler , Gas change water, the aging pipe network, heat transfer stations and other projects to transform. Shandong requirements, unit, boiler and pipe network transformation to synchronize, network reconstruction to be synchronized with the local municipal road construction, ensure that started that year, then delivered.

Conditional exchange station areas can be phased out

Learned that, in principle, the implementation of urban heating heat pipe, heat transfer station operations and integration of direct supply home heating system; more heat source heating can also be implemented Chang Wangfen away. Conditions, can be phased out organs, enterprises, residential area of heat transfer station operation, unified management by the heating enterprises and network operators. On poor management, poor management, heat, poor quality of public complaints are mainly heating and heat transfer station operating business units, enhance operational control, in serious cases will be suspended until the abolition of the right to operate its heating. Implementation of the required heating conditions, but fail to network construction projects, heating department will work with real estate development, construction and management, supervise the construction unit after passing the grid heating rectification.

Energy Saving Heating System Upgrade 3 years

From September 2009 onwards, and strive to basically complete with a 3-year provincial city heating system energy saving. Which, for urban heating, qualified Condensing unit shall be replaced by low-temperature thermoelectric circulating water heating system. For heating steam pipe to hot water pipe network, a comprehensive renovation of more than 15 years of age to use heat pipe, heat loss will be controlled within 5%. In addition, the heating system will speed up the implementation of computer remote telemetry Monitor Improve the heating efficiency. The rebuilding of this year will be completed before the heating period by 30% in 2010 to complete 50% of the heating period, heating period in 2011 before completion.

Related topics: Heating industry: Do you worry about the heat it?

Related Reading: Do not deflect heat idea

Shenyang focus to corporate regulation Provincial Standing Committee recommends that: to be the coexistence of a variety of heating

Self-heating boilers and heat exchange station rates are subject to publicity

I am a professional writer from Cheap On Sales, which contains a great deal of information about $keyword_li, welcome to visit!

Processing your request, Please wait....

Leave a Reply