Crusher Plant Layout
Crusher Plant Layout-Crusher Plant Layout Mining Operation Process
A well-designed crusher plant layout balances the capital versus operating cost over mine life. Buildings, infrastructure, and major equipment items, represent the major cost elements of a crushing plant. The designer must prepare a layout that suits the design criteria, flowsheet and selected equipment in the most economical possible configuration. It’s important to keep structural costs down, to design for ease of maintenance and operation, and to combine best practices with advances in fabrication and erection. Input from an experienced mining plant structural engineer can be very helpful.
Different industries have different approaches to crushing plant design. The standard approach in the oil sands industry is to use MicroStation 3D CAD from the start; in some cases, the finalization of a system design (hopper, feeder, sizer crusher, and takeaway conveyor) has taken as much as two years, because of the uniqueness of the application. A similar design in the hard-rock mining industry takes from four to six months.