How to replace cone crusher wall
How to replace cone crusher wall
Cone crusher wall is mainly fixed in the cone body with conical head, and cast zinc alloy between the two. After first installation or replacement cone crusher wall for 6-8 hours, you should check the fastening, if find loose, should immediately fasten it.
Crusher and its equipment:
Output production of the crusher: the feed to the feed block, the block size of the row of ore, ore physical mechanical properties, temperature and other relevant variables, so the manufacturer for a given output is in terms of their designation under the approximate throughput. Production of aggregates by the equipment include the following: cone crusher, jaw crusher, impact crusher, impact crusher, and a matching circular Sand and Gravel equipment.
The cone crusher is of big crushing ratio, high efficiency, low energy consumption, uniform particle size and suitable for crushing hard ore, etc., and thus widely favored by the mineral processing sector. Cone crusher liner often has a strong impact, prone to severe wear. This causes non-uniform particle size, the decline in production efficiency and energy consumption increases, so the crusher liner replacement is essential. Replacement of the new liner is usually used in high temperature zinc alloy casting or at room temperature high-grade cements mortar casting method, often broken wall with loose rolling ace tabular wall, fixed difficulty, seriously affecting the production of normal operation in the production and maintenance processes. Based on past experience shows, the replacement of a cone crusher liner and casting time required is approximately 7 to 10 days, the replacement cycle is too long, seriously affecting the normal production schedule, for the relevant staff continue to explore and study, repeated practice is accumulated, the development of a cone crusher liner to fill the new technology – epoxy filler (broken rear rubber lined).