high pressure solenoid valve installation
1, Before installation should refer to the product manuals, whether to accord with your requirement.
2, The pipe should be washed clean before using, dirty medium should install filters to prevent impurities interfere with the normal work of the solenoid valve.
3, A long time after discontinuation of high pressure solenoid valve, should be cleared coagulationbefore using; When washing according to the order of the parts, in order to installed restitution easy.
4, solenoid valve is generally one-way work, cannot reversed, the valve arrow is the direction of pipeline fluid movement, to be consistent.
5, Solenoid valve in place of icy should be heated, or set the insulation measures.
6, General body level, the coil vertical, some products can be any installation, but when the conditions permit, the best is vertical,in order to increase service life.
7, After lead wire of solenoid valve coil connected, you should confirm whether firmly,join of electrical components should not jitter, loose will cause the solenoid valve does not work. Continuous production of solenoid valves had better use bypass, easy maintenance, do not affect production.