certification
certification for the development of a comprehensive set of network implementations, the current application for certification can be achieved in the CQC network applications anytime, anywhere. The following will be described in five parts on the drawings for detailed explanation. 1. Philips Conversion Kit Projector Open Beam 7X6 Headlights user name, fill in the application necessary to submit product information sheet, according to the product parameters to develop testing program. In the online application process, if the customer what information to fill in error, before accepting the engineer can modify received in the receiving engineers admissible, if the client application to modify the information, it must be modified by accepting engineers. 2. Type acceptance test engineers, customer acceptance of new applications, it will send samples under the notice, the customer must send product samples to laboratories for testing samples, the test will be issued after lab test results type test report. 3. Factory inspection is completed when the type test, but also the production plant factory inspection, if the customer has similar products production plant has been checked, the new applications do not need to be factory inspection, but still needs a year to conduct a production plant supervision and inspection. Factory inspection is an important part of PV product certification. Factory inspection of the certified products meet the certification requirements to ensure that play a key role. Check the contents of the factory, including factory quality assurance ability and product consistency check in two parts. The examination content from the following ten components: responsibility and resources; documents and records; procurement and incoming inspection; production process control and process inspection; routine tests and verification tests; inspection and test and instrumentation equipment; Control of nonconforming product; internal quality audit ; consistency of certified products; packaging, handling and storage. This provision requires ten CQC to as the “capacity of the factory warranty requirements