Jaw Crusher Operation

Jaw Crusher Operation,Operate Jaw Crusher instruction,specification

1. Jaw-load test

(1) jaw crusher 2 hours continuous operation, bearing temperature must not exceed 30 ℃.

(2) All fasteners should be firm, without loosening

(3) flywheel, grooved wheel running smoothly.

(4) All components of friction without abrasion, debris and grinding out the phenomenon, no unusual sound.

(5) The nesting population of the adjustment device should be able to ensure that nesting population adjustment range.

2. Jaw-load test

(1) Operate jaw crusher can not have a cyclical or significant impact of a crash.

(2) Maximum feed size should be consistent with design requirements.

(3) continuous operation 8h, bearing temperature rise shall not exceed 30 ℃.

(4) The Crusher processing capacity and product size should meet the design requirements

(5) adjusting the seat and rack ears no significant Zama ran.

3. Jaw Crusher Operation prior to use

(1) double-check whether a good lubrication of bearings, thrust plate connections have enough grease.

(2) Carefully check all fasteners is fastened.

(3) Carefully check the belt is good. If found to have broken the phenomenon should be promptly replaced, when the transmission belt or the pulley there is oil, the application of oil rag and wipe.

(4) Check the protection device is well and found that insecurity should be immediately removed.

(5) Check whether the ore crushing cavity or debris, if ore or debris, then must be cleaned to ensure that the crusher cavity start.

(6) Check whether the return from the top bolts, gaskets group is pressed, T-bolt is tightened.

Jaw crusher start

(1) The examination proved that the normal situation in all parts of the machine before starting.

(2) The jaw crusher is only allowed in case of no-load starting.

(3), starting before, we must use ring tones or signals prior warning.

(4), after starting, if there is not a normal phenomenon, should immediately stop functioning. To be identification and removal of non-normal situation, before re-starting crusher.