Maintaining Tips for Hongxing Cone Crusher
HXJQ CO.LTD is a professional Symons Cone Crusher manufacturer and exporter in China. We are specializing in Symons Cone Crusher. These products are been delivered to Europe, United States, Asia, the Middle East, Russia, Africa etc. countries. We are expanding more cooperation partners all over the world.
There are two types of rock crushers in actual production, that is, primary crusher and secondary crusher. Secondary crushers mainly handle rocks of smaller particle size that have already been impacted and crushed from their original size. In recent years, with the rapid development of infrastructure projects, rock crushers have found more applications in various fields and industries, such as mining, chemical industry, road construction, metallurgy, construction and so on.
As a type of frequently used secondary crusher, cone crusher’s working principle is quite similar to that of the gyratory crusher. Nevertheless, the difference is that the crushing chamber in a cone crusher isn’t as steep as it is in a gyratory crusher and the positions of the different crushing zones are more parallel.
1.Cone crusher working note: Mine must be allocated to the plate in the middle , forbidding the mine goes into the crushing cavity directly. Because it is easy to make crusher overload and the liner wear unevenly . The condition of giving mine:
a. Mine evenly was distributed in the crushing cavity through the distribution plate. b. Feeding ore can’t higher than the level of rolling acetabular wall. The crusher to the maximum size of giving mine couldn’t be allowed equal to the mine mouth size ( the maximum size of giving mine = 85% to the mine mouth size) ,or they will lead to : a. Crushers yield reduced. b. Damage to certain parts of the crusher.stone crusher plant:http://www.hx-china.com/6.html
hydraulic cone crusher:http://www.hxjq-crusher.com/8.html
2.Crushers are not allowed to start overloading , because the overload will start the accident. When the crusher will finish the work,at first we must stop to the mining machine . When crushing the mine goes into the crushing cavity after discharge ,it can make crusher stop.Crusher should be always checking the pressure and hydraulic locking system work station , once we identify problems and handling in time .
3. Crushers’ output Crushers’ output, and feeding methods , feeding degradation, platoon ore blocks degrees size,mechanical properties, temperature and so on . Varies greatly,the manufacturer of a given output is sketchy the quantity in the specified conditions.
4. The replacement of rolling acetabular wall. Rolling acetabular wall with U shape screws embedded in the adjustment of the ring, both between infusing zinc alloy and making closely. New installation or the replacement of rolling acetabular wall, in the work six to eight hours we should check for tightening situation ,and once again tighten the u-shaped screw.