PE ball valve construction method – construction methods – filtration and separa
Construction method 1, pre-construction precautions Construction of buried gas in accordance with the provisions of the depth, if buried deeper than construction requirements, you must use the protection tube. After the first stone excavation, gravel and other debris cleared, and then paved with sand about 10cm thick and the pressure well. valve and piping connecting […]